Knowledge Base

Getting Started

Guides, videos and manuals for your AEON laser.

Getting StartedNOVA Redline

Getting Started with REDLINE NOVA

Prepare your workspace, then receive, uncrate, roll off the pallet, set up and power on a REDLINE NOVA for the first time.

Read Guide →
Getting StartedMIRA S series

Getting Started with REDLINE MIRA 7S and MIRA 9S

Prepare your workspace, then receive, uncrate, set up and power on a REDLINE MIRA 7S or MIRA 9S for the first time.

Read Guide →
Getting StartedMIRA S series

Getting Started with REDLINE MIRA 5S

Prepare your workspace, then receive, unpack, set up and power on a REDLINE MIRA 5S for the first time.

Read Guide →
Getting StartedMIRA S series

What’s in the Box: REDLINE MIRA S and NOVA S

The standard contents that ship with a REDLINE MIRA S or NOVA S, with a photo of each item.

Read Guide →
All machinesGetting Started

Prepare Your Workspace

Electrical, ventilation, safety and temperature requirements to set up before your laser arrives.

Read Guide →
All machinesGetting Started

Laser Delivery

Inspect the crate when your laser arrives, and report any damage without refusing the shipment.

Read Guide →
Getting StartedNOVA Legacy

Unboxing and Setting Up Your NOVA

Video walkthroughs for uncrating a NOVA, setting it up, checking the alignment and running a first engrave.

Read Guide →
Getting StartedMIRA Legacy

Lifting, Turning or Moving Your MIRA

Prepare a MIRA 7 or MIRA 9 for tight spaces, then tip it safely onto its side on a furniture dolly.

Read Guide →
Getting StartedMIRA Legacy

Lifting Your MIRA onto a Stand or Workbench

How four people lift a MIRA safely onto its stand or a workbench, then level it.

Read Guide →
Getting StartedMIRA Legacy

Unboxing and Setting Up Your MIRA Pro

Uncrate a MIRA Pro, lift it onto its stand, unpack it, fill the chiller, vent the fan and power it on for the first time.

Read Guide →
Getting StartedMIRA Legacy

Unboxing and Setting Up Your MIRA

Uncrate a MIRA, lift it onto its stand, unpack it, fill the chiller, vent the fan and power it on for the first time.

Read Guide →
All machinesGetting Started

Machine Shipping and Receiving: What to Expect

What to tell us before delivery, how tracking and scheduling work, and what to check when your machine arrives.

Read Guide →
Getting StartedNOVA Legacy

Disassembly and Reassembly: NOVA

Take a NOVA 10, 14 or 16 apart into its top and base, move it through tight spaces, then reassemble and rewire it.

Read Guide →
Getting StartedNOVA Redline

Disassembly and Reassembly: REDLINE NOVA S

Take a REDLINE NOVA apart into its top and base, move it through tight spaces, then reassemble and reconnect it.

Read Guide →

Still Stuck? Call (321) 260-2325

Our US-based support team is one phone call away. More ways to reach us are on the Support page.

Open a Support Ticket